L6: Labomar’s new logistics hub is up and running

19 June 2025
The first area of the new L6 plant is operational, a strategic milestone in Labomar Group’s path of growth and empowerment.
Designed to optimize workflow and boost operational efficiency, the new site features larger, modern, and highly functional spaces.
L6 in numbers:
• Total area: 7,000 m²
• Pallet places: 7,525
• Refrigerated pallet spaces: 140
• About 50 thousand parcels handled per year
• Photovoltaic system covering more than 80% of the hub’s needs
• Plantings: 2920
A 346 kW photovoltaic system has been installed in the new logistics hub, capable of generating more than 419,000 kWh of clean energy per year. This system will avoid the emission of more than 132 tons of CO₂ each year, a positive environmental impact equal to about 100 medium-haul airline flights per passenger
(source: estimate based on ICAO, DEFRA and TERNA data).
Another key feature is the wastewater treatment plant, shared with the L3 facility, with a maximum capacity of 90 m³/day. The purified water will be recovered and used for irrigation, contributing to the environmental sustainability of the site.
L6 represent a tangible investment in the future, serving Labomar Group’s quality, logistics and environmental commitment.
For more details, read the full Press Release in the Media section.